YAREX
YAREX

We know what fails.
We build what lasts.

Renovation + Restoration

We open the wall before we quote. What is behind it decides the scope, the number, and how the room gets built back.

Interior stripped to the studs after water damage
Restoration-backed.
Renovation-focused.
Built on evidence.
Eleven cities
Served from Etobicoke
Licensed
Insured
Documents at your estimate
Permits handled
Drawn, filed, inspected
24/7
Water, mold and fire
Evidence. Not excuses.
What we found
A water-stained ceiling torn open to expose a sweating copper supply line and saturated insulation sagging out of the cavity
Water intrusion
A tiled bathroom wall opened at the base, showing waterproofing membrane that stopped short of the floor above blackened mortar and rotted studs
Failed waterproofing
A wall cavity opened to reveal black mold across the studs and sheathing behind pulled-back fibreglass insulation
Mold damage
A floor opened to expose a joist that has lost section to rot, with crumbling timber alongside sound new lumber
Structural impact
What we built
A finished kitchen renovation with white oak cabinetry, a stone-wrapped peninsula, marble backsplash and brass hardware
Kitchens
A finished bathroom renovation in stone tile, with a curbless glass shower, freestanding tub and a wall-hung oak vanity
Bathrooms
A finished basement with full-height ceilings, oak floors, a linear gas fireplace and built-in oak shelving
Basements
An open main floor after a whole-home renovation, with oak floors, a steel-and-oak staircase and a stone island under a skylight
Whole homes

Featured projects

View all projects

Lawrence Park
Kitchen & main floor

A full main floor renovation featuring a reconfigured kitchen, engineered hardwood, and custom millwork throughout.

Rosedale
Primary ensuite

A spa-inspired ensuite with heated floors, custom vanity, and a curbless walk-in shower.

Our process
01

Investigate

We open what needs opening. Moisture readings, substrate, framing — findings first, scope second.

02

Restore

Waterproofing, blocking, vapour barrier, slope to drain. The part you never see again.

03

Renovate

Cabinetry, stone, tile, millwork, paint. The punch list closes in writing before the keys go back.

Fixed estimate. Permits handled.
Built on evidence.

No surprises. No shortcuts. A written scope, an itemized number that holds, and permits filed before demolition.

24/7 Response(416) 358-2059Fixed estimate