YAREX
Serving Richmond Hill

Renovation and restoration in Richmond Hill

YAREX Renovation & Restoration does home renovation in Richmond Hill. The licensed and insured company renovates the city's 1980s to 2000s subdivision homes, builds permitted basement suites and high-spec kitchens, and provides 24/7 emergency water, mold and fire restoration from its Etobicoke base via Highways 427 and 407. Free estimates at (416) 358-2059.

Based in
Etobicoke, ON
Emergency
24/7 dispatch
Estimates
Free and fixed
The housing stock

Richmond Hill's core stock is 1980s to 2000s subdivision housing: executive two-storeys in Bayview Hill, family streets in Mill Pond and Crosby, and newer phases in Jefferson and Oak Ridges near the moraine. The older of these homes are now 30 to 40 years old and entering full kitchen, bathroom and basement renovation age, while the Yonge corridor is adding condo towers with their own renovation market.

Richmond Hill hits renovation age

Richmond Hill was built out in a rush between the mid 1980s and the 2000s, and that stock is now due. Original oak kitchens in Mill Pond and Crosby, first-generation ensuites in Bayview Hill, and unfinished basements in Jefferson are all reaching the point where owners renovate properly rather than patch. YAREX handles the full range: kitchens, bathrooms, basements, permitted suites, custom carpentry and whole-home projects. Licensed, insured, free estimates.

From Bayview Hill to the moraine

The city splits into clear renovation markets. Bayview Hill is executive stock, large 1990s two-storeys where projects run to custom kitchens, principal-suite bathrooms and millwork throughout. Mill Pond and Crosby mix older family housing with mature streets, and their renovations centre on opening main floors and finishing basements. Oak Ridges and Jefferson sit up against the Oak Ridges Moraine, where interior work proceeds normally but additions near protected features can need extra review, something we confirm lot by lot. Basement suites are a growing share of our work here: Richmond Hill permits additional residential units under provincial rules with local zoning, permit and registration requirements, and the typical 1990s basement has full ceiling height, so a legal suite is mostly a matter of entrance, fire separation, egress and paperwork. Along Yonge and at Langstaff, new condo towers add unit renovations run through property management.

Emergency response via the 407

Water finds finished basements, and Richmond Hill has thousands of them. YAREX runs 24/7 crews for burst pipes, flooding, sump failures, mold and fire damage. From our Etobicoke base the 427-to-407 run reaches most of Richmond Hill in 35 to 45 minutes, quicker overnight. One contract carries the job from extraction and drying through the finished rebuild. Call (416) 358-2059.

Evidence from Richmond Hill and the GTA
What we found
A water-stained ceiling torn open to expose a sweating copper supply line and saturated insulation sagging out of the cavity
Water intrusion
A tiled bathroom wall opened at the base, showing waterproofing membrane that stopped short of the floor above blackened mortar and rotted studs
Failed waterproofing
A wall cavity opened to reveal black mold across the studs and sheathing behind pulled-back fibreglass insulation
Mold damage
A floor opened to expose a joist that has lost section to rot, with crumbling timber alongside sound new lumber
Structural impact
What we built
A finished kitchen renovation with white oak cabinetry, a stone-wrapped peninsula, marble backsplash and brass hardware
Kitchens
A finished bathroom renovation in stone tile, with a curbless glass shower, freestanding tub and a wall-hung oak vanity
Bathrooms
A finished basement with full-height ceilings, oak floors, a linear gas fireplace and built-in oak shelving
Basements
An open main floor after a whole-home renovation, with oak floors, a steel-and-oak staircase and a stone island under a skylight
Whole homes
Answers

Richmond Hill — questions

01Are basement apartments allowed in Richmond Hill?

Yes. Richmond Hill permits additional residential units in most low-rise homes in line with provincial rules, subject to zoning, a building permit and registration requirements. Code drives the design: ceiling height, egress, fire separation and smoke alarms. Most 1990s Richmond Hill basements have the height to convert without underpinning, which keeps costs down.

02How much does a kitchen renovation cost in Bayview Hill?

Bayview Hill homes are large, and their kitchens usually renovate at executive scale: custom cabinetry, stone counters and islands sized to the room. Budgets typically start in the high tens of thousands and rise with millwork and appliances. We provide a free itemized estimate for the specific house rather than a per-square-foot guess.

03Does building near the Oak Ridges Moraine affect renovations?

For interior renovations, no. For additions or major exterior work in Oak Ridges and Jefferson, properties near key natural features can face extra review under moraine conservation policies and local zoning. We confirm what applies to your lot before quoting structural work.

04How long does it take YAREX to reach Richmond Hill?

Scheduled work is planned like any local job. For emergencies we dispatch 24/7 from Etobicoke, taking the 427 to the 407. Most of Richmond Hill is 35 to 45 minutes away, less overnight.

Fixed estimate. Permits handled. Richmond Hill to Etobicoke.

We hold one contract from demolition to handover, and answer the emergency line around the clock across the GTA.

24/7 Response(416) 358-2059Fixed estimate