Toronto · Kitchen · 2024

Lawrence Park Kitchen & Main Floor

A full main floor renovation featuring a reconfigured kitchen, engineered hardwood, and custom millwork throughout — after two years of concealed leakage from a failed shower pan above was found on day one.

ScopeKitchen, dining, powder room
Duration11 weeks
PermitsHandled by YAREX
Found firstFailed shower pan above
Lawrence Park Kitchen & Main Floor — a completed kitchen renovation in Toronto, as built
Lawrence Park Kitchen & Main Floor — as built
What we found

The client called about a kitchen refresh. Behind the ceiling we found two years of slow leakage from a failed shower pan on the floor above, and joists that had lost section.

We restored the structure and the waterproofing first. Only then did we build the kitchen.

Ceiling opened in a Toronto kitchen to reveal two years of concealed leakage from a failed shower pan on the floor above, with joists that had lost section
Concealed leak
The Toronto kitchen rebuilt after structural restoration, with a reconfigured layout, engineered hardwood and custom millwork through the main floor
Rebuilt kitchen
Where the money went
PhaseAmount
Restoration — shower pan, joists & drying$18,400
Demolition, structure & rough-in$26,900
Custom millwork$39,800
Stone, tile & flooring$31,250
Fixtures, lighting & paint$12,700
Permits, drawings & management$13,800
Fixed estimate total$142,850

How it ran

01

Investigate

Moisture mapping and a selective opening on day one. Cause-of-loss documented before any pricing.

02

Restore

Structure and waterproofing corrected first, dried to a verified reading.

03

Renovate

Then the finish — millwork, stone and flooring, on an assembly that will hold.

The client called about a kitchen refresh. We opened the ceiling on the first day, as we do on every project, and found two years of slow leakage from a failed shower pan on the floor above. Two joists had lost section. Nothing about the kitchen the owners wanted was possible until that was corrected.

Moisture mapping came first, then a documented cause-of-loss report before any pricing. That sequence is not a courtesy — it is the only way a fixed estimate can stay fixed. Pricing a kitchen over a wet structure means repricing it later.

We sistered the affected joists, rebuilt the shower pan above to a proper sloped mortar bed with a bonded membrane, and dried the structure to a verified moisture reading before closing anything up. The restoration portion ran $18,400 of the total. It is the part of this project nobody will ever see again.

Only then did we build the kitchen. The partition to the dining room came out, the opening was reframed with a flush header for a clean drywall return, and the layout was reconfigured around a working island. Custom millwork in painted MDF with integrated appliance panels. Quartz counters with a full-height backsplash. Engineered hardwood running unbroken through the kitchen, dining room and powder room.

Permits were prepared and filed by us, and the inspections scheduled around the trade sequence rather than the other way round. Eleven weeks on site, one project lead, and a punch list closed in writing before the keys went back.

More work

Toronto · 2024
Rosedale Primary Ensuite

A primary ensuite with heated floors, a custom vanity and a curbless walk-in shower, built on a rebuilt subfloor and a properly sloped, fully bonded waterproofing assembly.

Etobicoke · 2025
The Whitmore Residence

A dated 1950s Etobicoke bungalow taken back to the studs and rebuilt as an open, light-filled family home with new systems throughout and a reworked main-floor plan.

Fixed estimate. Permits handled.
Built on evidence.

No surprises. No shortcuts. A written scope, an itemized number that holds, and permits filed before demolition.

24/7 Response(416) 358-2059Fixed estimate