Etobicoke · Full Home · 2025

The Whitmore Residence

A dated 1950s Etobicoke bungalow taken back to the studs and rebuilt as an open, light-filled family home with new systems throughout and a reworked main-floor plan.

ScopeFull home, to the studs
Duration16 weeks
PermitsHandled by YAREX
Found firstKnob-and-tube wiring
The Whitmore Residence — a completed full home renovation in Etobicoke, as built
The Whitmore Residence — as built
What we found

Knob-and-tube circuits in the ceiling cavities, original wiring throughout, and a load-bearing wall between the kitchen and living room.

The original subfloor had sagged almost an inch across the living room. The affected joists were sistered and the subfloor relaid flat before any finish went down.

Interior of a 1950s Etobicoke bungalow before renovation, with original knob-and-tube wiring exposed in the ceiling cavity and a sagging original subfloor
Knob-and-tube
The same Etobicoke bungalow after a full-home renovation, with a flush LVL beam replacing the load-bearing wall and the subfloor relaid flat
Rebuilt main floor
Where the money went
PhaseAmount
Demolition, structure & subfloor repair$41,200
Electrical & plumbing — rewire, replumb, new stack$66,900
HVAC, heat pump & insulation$46,400
Kitchen, bathrooms & millwork$118,600
Floors, drywall, trim & paint$62,400
Permits, engineering & management$28,700
Fixed estimate total$364,200

How it ran

01

Investigate

Moisture mapping and a selective opening on day one. Cause-of-loss documented before any pricing.

02

Restore

Structure and waterproofing corrected first, dried to a verified reading.

03

Renovate

Then the finish — millwork, stone and flooring, on an assembly that will hold.

The house was a solid 1950s brick bungalow that had not been touched in decades: a chopped-up main floor, original wiring, a galley kitchen closed off from the living space, and a single dated bathroom serving the whole family.

The brief was straightforward. Open the main floor, bring every system up to current code, and make the house work for a young family for the next twenty years — without losing the character of the brick exterior.

We stripped the interior to the studs. The wall between the kitchen and living room was load-bearing, so a flush LVL beam went in on engineered drawings, keeping the ceiling plane clean across the new open space. The electrical panel was upgraded to 200 amps and the house fully rewired, replacing the knob-and-tube circuits found in the ceiling cavities. Plumbing was replumbed in PEX with a new stack serving a relocated main bathroom and a new ensuite. Spray foam brought the exterior walls and rim joists to current code, and new ductwork was sized for a high-efficiency furnace and heat pump.

The challenge surfaced during demolition: the original subfloor had sagged almost an inch across the living room. Rather than feather it with leveller and hope, we sistered the affected joists and relaid the subfloor flat — two extra days that made every finish downstream sit true.

The result is a bright, open home with site-built millwork around the fireplace, a kitchen that anchors the plan, and mechanical systems that will not need attention for decades.

More work

Toronto · 2025
Lakeview Kitchen

A closed-off 1960s kitchen in a Toronto side-split opened to the dining room and rebuilt around a quartz island, custom cabinetry, and properly upgraded electrical service.

Mississauga · 2024
Elm Street Addition

A 400-square-foot rear addition on a Mississauga two-storey, adding a family room and mudroom on a new foundation with the roofline tied cleanly into the existing structure.

Fixed estimate. Permits handled.
Built on evidence.

No surprises. No shortcuts. A written scope, an itemized number that holds, and permits filed before demolition.